CAN/CSA Z259.14-01 PDF

CAN/CSA Z259.14-01 PDF

Name:
CAN/CSA Z259.14-01 PDF

Published Date:
11/30/2001

Status:
Active

Description:

Fall Restrict Equipment for Wood Pole Climbing

Publisher:
Canadian Standards Association / National Standard of Canada

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$25.5
Need Help?
This is a text searchable PDF.

1.

Scope

1.1 This Standard outlines the requirements for testing the performance and strength of fall restrict equipment for wood pole climbing.

1.2 This Standard specifies the equipment to be used by a single worker exposed to the hazard of falling when ascending/descending, moving around, and working on or from a wood pole.
File Size : 1 file , 390 KB
Note : This product is unavailable in Russia, Ukraine, Belarus
Number of Pages : 24
Published : 11/30/2001

History

CAN/CSA Z259.14-01
Published Date: 11/30/2001
Fall Restrict Equipment for Wood Pole Climbing
$25.5

Related products

CAN/CSA C813.1-14 (R2024)
Published Date: 05/01/2014
Performance Test Method for Uninterruptible Power Supplies
$24
CAN/CSA C22.2 NO. 60601-2-34:12 (R2022)
Published Date: 05/31/2012
Medical Electrical Equipment - Part 2-34: Particular Requirements for the Safety, Including Essential Performance, of Invasive Blood Pressure Monitoring Equipment (Adopted IEC 60601-2-34:2000, second edition, 2000-10)
$84.9

Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
$138
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
$138
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
$138
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
$138